{"id":1545,"date":"2022-10-04T07:55:51","date_gmt":"2022-10-04T07:55:51","guid":{"rendered":"http:\/\/javaoffshore.com\/?p=1545"},"modified":"2022-10-04T07:55:51","modified_gmt":"2022-10-04T07:55:51","slug":"java-offshore-attends-sunrise-ceremony-of-bataan-cavite-interlink-bridge-philippines","status":"publish","type":"post","link":"https:\/\/javaoffshore.com\/jo2\/java-offshore-attends-sunrise-ceremony-of-bataan-cavite-interlink-bridge-philippines\/","title":{"rendered":"Java Offshore attends Sunrise Ceremony of Bataan &#8211; Cavite Interlink Bridge, Philippines"},"content":{"rendered":"<p>Last month, Java Offshore attended Sunrise ceremony of Bataan &#8211; Cavite Interlink Bridge (BCIB) project under the Department of Public Works and Highways (DPWH), Philippines. This three-phase campaign awarded to Java Offshore supports the detailed engineering design (DED) works for the Bataan-Cavite Interlink Bridge, a 32-kilometer-long inter-island bridge project between the provinces of Bataan in Central Luzon and Cavite in Southern Tagalog Regions.<\/p>\n<p>Java Offshore was honoured to be appointed as the contractor of choice for Geophysical Survey and Geotechnical Investigation for this campaign.<\/p>\n<p>On September 18, 2022, Java Offshore\u2019s geotechnical vessel MV Trinity Surveyor successfully reached the target depth of 125 meters borehole for the South Channel Bridge area. Our vessel Trinity Surveyor was chosen for her proven ability to acquire seabed soil samples.<\/p>\n<p><strong><u>On 23rd September 2022<\/u><\/strong>, being part of the Sunrise Ceremony BCIB project. Java Offshore is proud to host delegates from various stakeholders; DPWH Senior Undersecretary Emil Sadain together with Bataan Governor Jose Enrique S. Garcia III, Bataan 3rd District Representative Maria Angela Garcia, RMCII Multilateral UPMO Project Director Sharif Madsmo H. Hasim, Project Manager Teresita V. Bauzon, Mariveles Mayor Ace Jello Concepcion and DED Consultants lead by Marwan Nader to visit and witness our Geotechnical vessel Trinity Surveyor in operation.<\/p>\n<p>According to Senior Undersecretary Emil K. Sadain, evaluating underground conditions and site characterization over the waters of Manila Bay are still on-going with an overall accomplishment at 55 percent to date. He also mentioned the geological aspects of the site, surface and subsurface, will continue to be studied in more detail.<\/p>\n<p>Since mid of this year, Phase 1 and 2 of the Geophysical Campaign has been successfully completed through the utilisation of Java Offshore\u2019s dedicated offshore survey vessel, RV Java Irdina and our partner\u2019s nearshore boat, MV Isla covering water depths as shallow as 3m to over 40m. The data obtained from the Geophysical Program was processed and interpreted through our in-house reporting team supported by specialised 3<sup>rd<\/sup> party processing houses.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_1547\" aria-describedby=\"caption-attachment-1547\" style=\"width: 1080px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1547 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-09-23-at-2.28.45-PM.jpeg\" alt=\"\" width=\"1080\" height=\"810\" srcset=\"https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-09-23-at-2.28.45-PM.jpeg 1080w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-09-23-at-2.28.45-PM-300x225.jpeg 300w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-09-23-at-2.28.45-PM-1024x768.jpeg 1024w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-09-23-at-2.28.45-PM-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><figcaption id=\"caption-attachment-1547\" class=\"wp-caption-text\">Sunrise Ceremony in Mariveles, Bataan, Philippines<\/figcaption><\/figure>\n<figure id=\"attachment_1546\" aria-describedby=\"caption-attachment-1546\" style=\"width: 1079px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1546 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-10-06-at-4.43.05-PM-1.jpeg\" alt=\"\" width=\"1079\" height=\"720\" srcset=\"https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-10-06-at-4.43.05-PM-1.jpeg 1079w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-10-06-at-4.43.05-PM-1-300x200.jpeg 300w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-10-06-at-4.43.05-PM-1-1024x683.jpeg 1024w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-10-06-at-4.43.05-PM-1-768x512.jpeg 768w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/WhatsApp-Image-2022-10-06-at-4.43.05-PM-1-930x620.jpeg 930w\" sizes=\"auto, (max-width: 1079px) 100vw, 1079px\" \/><figcaption id=\"caption-attachment-1546\" class=\"wp-caption-text\">Vessel on 4-point Mooring at the South Channel Bridge Location<\/figcaption><\/figure>\n<figure id=\"attachment_1553\" aria-describedby=\"caption-attachment-1553\" style=\"width: 1032px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1553 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/Picture1.png\" alt=\"\" width=\"1032\" height=\"544\" srcset=\"https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture1.png 1032w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture1-300x158.png 300w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture1-1024x540.png 1024w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture1-768x405.png 768w\" sizes=\"auto, (max-width: 1032px) 100vw, 1032px\" \/><figcaption id=\"caption-attachment-1553\" class=\"wp-caption-text\">HSE and Operation Briefing before the vessel walkabout<\/figcaption><\/figure>\n<figure id=\"attachment_1552\" aria-describedby=\"caption-attachment-1552\" style=\"width: 1062px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1552 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/Picture2.png\" alt=\"\" width=\"1062\" height=\"585\" srcset=\"https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture2.png 1062w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture2-300x165.png 300w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture2-1024x564.png 1024w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture2-768x423.png 768w\" sizes=\"auto, (max-width: 1062px) 100vw, 1062px\" \/><figcaption id=\"caption-attachment-1552\" class=\"wp-caption-text\">Group photo with delegates from DPWH, Bataan Officials, TYLIN and Java Offshore on-board Geotechnical vessel Trinity Surveyor<\/figcaption><\/figure>\n<figure id=\"attachment_1551\" aria-describedby=\"caption-attachment-1551\" style=\"width: 950px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1551 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/Picture3.png\" alt=\"\" width=\"950\" height=\"559\" srcset=\"https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture3.png 950w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture3-300x177.png 300w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture3-768x452.png 768w\" sizes=\"auto, (max-width: 950px) 100vw, 950px\" \/><figcaption id=\"caption-attachment-1551\" class=\"wp-caption-text\">Briefing by VP Geotechical, Farid Saad on the Geotechnical Operations on the Drill Floor<\/figcaption><\/figure>\n<figure id=\"attachment_1554\" aria-describedby=\"caption-attachment-1554\" style=\"width: 580px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1554 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/Picture4.png\" alt=\"\" width=\"580\" height=\"646\" srcset=\"https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture4.png 580w, https:\/\/javaoffshore.com\/jo2\/wp-content\/uploads\/2022\/10\/Picture4-269x300.png 269w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\" \/><figcaption id=\"caption-attachment-1554\" class=\"wp-caption-text\">Briefing by EVP, Lee Weng Kai on the Overall Work Progress at the Muster Station<\/figcaption><\/figure>\n<figure id=\"attachment_1550\" aria-describedby=\"caption-attachment-1550\" style=\"width: 1170px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1550 size-full\" src=\"http:\/\/javaoffshore.com\/wp-content\/uploads\/2022\/10\/Bataan-Cavite-Interlink-Bridge-1-1170x780.jpg\" alt=\"\" width=\"1170\" height=\"780\" \/><figcaption id=\"caption-attachment-1550\" class=\"wp-caption-text\">Briefing by Lab Technician, Nasir on the Soil Samples recovered in the Soil Laboratory onboard<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>This three-phase campaign awarded to Java Offshore supports the detailed engineering design (DED) works for the Bataan-Cavite Interlink Bridge, Philippines<\/p>\n","protected":false},"author":1,"featured_media":1557,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"neve_meta_sidebar":"","neve_meta_container":"","neve_meta_enable_content_width":"","neve_meta_content_width":0,"neve_meta_title_alignment":"","neve_meta_author_avatar":"","neve_post_elements_order":"","neve_meta_disable_header":"","neve_meta_disable_footer":"","neve_meta_disable_title":"","_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[7,9,11,12],"tags":[],"class_list":["post-1545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-events","category-news","category-press-release","category-project-highlights"],"_links":{"self":[{"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/posts\/1545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/comments?post=1545"}],"version-history":[{"count":0,"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/posts\/1545\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/media\/1557"}],"wp:attachment":[{"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/media?parent=1545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/categories?post=1545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/javaoffshore.com\/jo2\/wp-json\/wp\/v2\/tags?post=1545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}